Welcome to B2BAGE
Hot sale modular interlocking plastic outdoor sports flooring with high cost performance
Hot sale modular interlocking plastic outdoor sports flooring with high cost performance

Minimum Order: 0
Quality/Safety Certification: 0.00


1. Warrabty:8~12years
2. Low maintain cost
3. Suitable for all weather condition
4. Eco-friendly

 

Product name

 high cost performance 100% recyclable interlocking sports flooring hot sale 2011

Material

100% polypropylene

Size:

250*250*13mm

Feature

strong resilience

Warranty

8~12 years

Usage

Basketball, Futsal, Tennis,Hockey, tennis, Gym Kindergarten, Multi-use

Load Capacity ,KG

 ≥1634.4

Rebound Rate

97%

Shock Absorption

55%

Coefficient of sliding friction

 0.59

High Temperature:

 70°C,can not be distorted and deformed in 24 hours

Low Temperature

-40°C,after 24 hours in low temperature, then immediately do free drop test from 1 metre high to concrete, can not be fractured and damaged

 

 

 

 

Advantage

1) Continous remove 10,000 times 

2)Long service life

3) Resilient surface for high impact sports

4) Extreme durability and consistent performance for life of court

5) Anti Slip Surface

6)Anti- bacterial

7) Easy to install (no adhesive required)

8) Easy access to base beneath 

9) Easy to maintenance

10)Special design for water drainage

11) Special manufacturing process reduces smell

12) non-fade

13)Recyclable

14)Fashionable

15)All-weather Usability

 

 

Applications

1.basketball sport court

2.volleyball sport court

3.tennis sport court

4.futsal sport court

5.handball sport court

6.indoor gymnasium

7.Shipping: for ship deck;  

8.Garden, Terrace, Villa courtyard;

9.ole playground reformation

10. garage

 

 

Installation

1.It can be installed directly over the concrete,asphalt or any other hard and flat surface,there are edgings for the finished courts, screws are needed, you should use the paper knife or circular saw to cut the tiles to make a perfect fit

2.The construction ground must be kept clean, lasting dry and without any crack. The rate of moisture in the concrete ground mustn't surpass  2.5% and the rate of moisture in the gypsum floor mustn't surpass 0.5%.

3. The floors must be spreaded out and layed on the ground for more than 24 hours and the temperature at the scene mustn't be lower than 15°C. The floors are installed after reduction. 

 

Maintenance

1.Don’t wear the nail shoes, High-heeled shoes.

2.After snow, clear in time. Don’t let snow leave on it longtime.

3.Often wash, or mopping the floor.

4.Don’t knock the floor by sharp object.

5.Don’t pour Sulfuric acid and hydrochloric to the floor.

 

 

 

Ads by Google



About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 B2BAGE Limited and/or its subsidiaries and licensors. All rights reserved.