1.AAC puts your project on the fast track
2.No resorting accelerates finish trade
3.Workable like wood

China AAC plant 

AAC plant contains the cutting machine, ball mill, autoclave, crusher and so on. The autoclave aerated concrete plant simple name is AAC equipment, Production Process of Aerated Concrete According to the category and quality of raw material, and the features of equipment, the aerated concrete can be manufactured in different processes. Generally, add water to ash, silica sand or slag and crush them into slurry; Then add powdery lime, cement of right amount, plaster, vesicant, foam stabilizer, and mix and pour it to mould frame; After curing, foaming and hardening, cut it into blocks and boards in different specifications; Finally, transport it into pressure steamer with steam-curing cart, and get the light cellular concrete after steam-curing with high temperature and pressure. Process Flow of an Annual Output 50, 000 m3---200, 000 m3 Aerated Concrete Steam-Curing Production
Production Engineering of China AAC plant :
1. Firstly, dose and match measured raw materials
2. After distributing, feed raw material into pouring mixer to make slurry
3. Through thoroughly mixing, the slurry is poured to mould
4. After pre-curing with a certain temperature & time, the block would reach certain hardness prepare for cutting

5. Tilting hoister would turn over 90 degree of mould
6. Then open the mould & separate it from block, take the block with side plate with cutting cart
7. The block then be cut through the cutter firstly of two vertical sides of block
8. Secondly the horizontal cutting
9. Finally the vertical cutting
10. After cutting, the block is hanged to trolley with side plate by semi-finished product hoister
11. Organizing the cut blocks and put them into autoclave
12. Hardening the blocks under certain temperature and pressure
13. Take finished products out of autoclave
14. The finished product hoister takes the finished product to stock shield
15. Packed for loading
16. The side plate return back by side plate roller
17. Side plate would be organized with open mould
18. Clean the mould and preparing for next pouring
19. Steel bars processing line for slab production

Construction Benefits
• Fast and efficient panel installation reduces labor cost
• Modular components provide for ease of erection
• AAC puts your project on the fast track
• No resorting accelerates finish trades
• No furring, insulation or drywall needed
• Workable like wood

Ads by Google



About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 B2BAGE Limited and/or its subsidiaries and licensors. All rights reserved.