we are the biggest company in China which supply complete biomass gasification power plant. we provide turn-key service...

Specifications

The company gasifies the raw materials such as rice hull, fruit hull, saw dust, palm hull, wheat straw, cotton straw, corn straw

Introduction to biomass internal-combustion power generation system

Models & specifications:400KW,800KW,1MW,1.5MW,2MW,etc
Applicable raw matrrials:All the plants and organic wastes
                         The grain size of raw materials is less than 30mm in general.
                         The water content of the raw materials is lower than 16% in general.
Nature of fuel gas:scope of calorific #118alue 6000 kilojoule/m3(standard)
                         Tar content 50mg./m3(standard)
                         Compositions N2 50-60%
                         Co2 10-20%
                         CO  10-18%
                         H2   3-9%
                         Ch   2-6%
                         CnHm  0.5-3%
                         Other 0.5-3%

Operation data:

          Auxiliary fuel:Not necessary
          Start time:About 45 minutes for cold start
          About 15 miutes for hot start
          Operator:According to the project scale:1-2 persons for each shift
          Raw material consumption:1.0-2.0kg raw materials for generation of each kilowatt-hour
          Power generation cost:Will be influenced by many factors. In most regions of china,the cost for generation of each kilowatt-hour is about RMB0.2 yaun.

Environment protection standara:

            Exhaust gas:The tail gas of gas engine shall reach the local industrial standard after treatment
            Waste water:The cooling water shall be trated internally for recycled use,and no waste water will be dis-charged.
            Waste residue:The solid wastes sahll be treated or reused through harmlessness treatment .No waste residue will be discharged.
            Noise:The region with noise>75 db will be reused to decrease noise influence.
            Smell:The space with smell will be sealed off with negative pressure,and the smell will not outflow

Ads by Google



About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 B2BAGE Limited and/or its subsidiaries and licensors. All rights reserved.