Welcome to B2BAGE
lift and elevator part
lift and elevator part

Minimum Order: 0
Quality/Safety Certification: 0.00


lift and elevator part:HJ-AC2 series control cabinet
it is used in building elevator and construction lift.

lift and elevator part:HJ-AC2 series control cabinet
it is used in building elevator and construction lift.

 

   ELEVATOR CONTROL CABIN   HJ-AC2   SERIES

 

   HJ-AC2

AC2 control cabinet is use HK2000-A4 control board use in cargo elevator the exchange of two-speed , LCD operation panel is the main feature ,easy for adjust, can use series and parallel communication , use the exchange of two-speed governor system in elevators drag to reduce the cost.

Function:

1.         two stage parallel

2.         Power scope:5~75KW

3.         Power requirethree phaseAC380V~400V   50HZ/60HZ

4.         Speed:≤1m/s

5.         Communication:full series,full parallel,half series.

6.         Suitable range: under 8 floor cargo elevator

7.         Leveling accuracy: ±3

8.         Floor display way: circle dotsquare lattice,BCD code,binary code,etc.

9.         Room temperature:10~45

 

Ads by Google



About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 B2BAGE Limited and/or its subsidiaries and licensors. All rights reserved.