Welcome to B2BAGE
1.2m led tube t8 lamp
1.2m led tube t8 lamp

Minimum Order: 0
Quality/Safety Certification: 0.00


1. lifespan 50000h
2. CE Rohs approved
3. Material: Aluminium alloy
4. Lighting Source: 1w350ma
5. Voltage:AC/DC 12V

1 Features:

 Tube type1.2M T8 LED tube
 Item NoTD-DGA22-264WT-L8
Lighting Source3020 SMD
MaterialAluminium alloy+PC
Lighting Source3020 SMD LED,4000-4800K 5500-6500K
 LED Quantity264pcs
 Working voltageAC100-1300V/200-260V
 Luminous Flux1300LM
 Color rendering indexRa>76%
 DimentionL1213*26mm
 Output power15W
 Operation  temperature-20~+55°
 Power efficiency80%-85%
 Power factor90%

 

2 Our advantages:

1)  low power consumption, high intensity

2) There is no harsh glare, directly replacement for the tranditional fluorescent t8/t10 tube

3) Green environment, without any harmful materials listed in RoHS

4) Adopt superhighlt bright LED light source, stably quality

5) Efficiency is as high as 90%, power factor as high as 0.9

 

3  Applications:

1)  Living room, bedroom, kitchen, washroom;

2)  School, university, hospital, hotel;

3)  Conference, meeting room, show room, showcase;

4)  Commercial complexes;

5)  Factory, plant, warehouse, office;

6)  Supermarket, department store;

 

 

4  Package

60cm led tube , 144pcs per carton , dimension 128*45*45 cm 

120cm led tube , 72pcs per carton , dimension 128*45*45 cm 

150cm led tube , 72pcs per carton , dimension 163 *45*45 cm

 

5  Installation

The same size tube can be installed on to the corresponding lamp holder directly before taking doan fluorescent lamp starter.

1. LED tube can be directly installed into T8 or T10 bracket(take down fluorescent lamp starter);

2. LED tube light apply to inductive light holder. 

3. Electronic ballast fluorescent tube can't be replaced directly. Should take down electronic ballast

 

6  Trade Term

1.Payment: T/T , 30% deposits before production, 70% balance to be paid before dleiverying  (Western Union is welcomed)

2.Production lead time  for 100~500pcs: 5-7days, 500~1000pcs:7-15days

3.Sample can be delivered in 3days

4.Shipping freight are quoted under your requests

5.Shipping port: Shenzhen, Mainland China

6.Discounts are offered based on order quantities

7.MOQ:10pcs

 

7 Our service:

1 Your inquiry related to our products or prices will be replied in 24hrs.

2 Well-trained and experienced staffs to answe all your enquires in fluent English.

3 OEM&ODM, any your customized lightings we can help you to design and put into product.

4 Distributoership are offered for your unique design and some our current models.

5 Protection of your sales area, ideas of design and all your private information.

 

About us

 ShenZhen TongDa Opto-Electronic Co., Ltd, founded in 2001, specializes indeveloping, manufacturing and selling LED light source and LED lighting products. The company consists of 2 main departments:Single LED manufacture Dept & LED lamps Dept. Owing about 500 staffs and about 80 professional and technician. Our company has a strong R & D team, high efficient management model, top after-sales service, and so many automatic production equipment, such as: Dis penser Machine, LED Die bonder, Gold wire bonder, LED packaging machine, LED testing machine, and LED sorting & spectral color separation machine.

 

Ads by Google



About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 B2BAGE Limited and/or its subsidiaries and licensors. All rights reserved.