Welcome to B2BAGE
LED tube(T10 16W led tube)SMD 3014
LED tube(T10 16W led tube)SMD 3014

Minimum Order: 0
Quality/Safety Certification: 0.00


LED tube(T10 16W led tube)SMD 3014
1.Long life can reach 50000hrs
2.Warrnty:2year
3.Certificate:CE/ROSH/FCC
4.Vol:AC120-220V

16W T10 LED TUBE

 

 

Features

Input voltage: AC120 V±15%;AC220V±15%

Color: R/G/B/W/Y

Color tepereture:2700-3500K/3500-4500K/5000-6000K/6500-7000K

Work temperature: -40°C±40°C

Length(mm):600/900/1200/1500mm

Certification: CE/ROSH/FCC

LED life(H):>5000h

Storage temperature: -30°C±60

Operating humidity: 30%-85%.

Storage humidity: 10%-90%

Storage environment: Indoor, ventilating, No corrosive gas in the air.

Type No.AZ-FT-T10-5011Color tepereture2700-3500K/3500-4500K
/5000-6000K/6500-7000K
LED3014
Quantity(pcs)192pcsWork temperature -40°C±40°C
Specifications(mm)30*1200mmLength(mm)600/900/1200/1500mm
Wattage(W)16WCertificationCE/ROSH/FCC
Distance=3m(lux)50lmLED life(H)>5000h
Lumens(lm)1400lmStorage temperature-30°C±60
Input voltageAC220V±15%Operating humidity30%-85%
ColorR/G/B/W/YStorage humidity10%-90%

Applications

1.Office ,factory, supermarket, basement, school, home, warehouse, electrical distribution facilities, transform room,

 workshop, chemical factory ect interior lighting. LED Tube saving energy cost and less heating, without mercury etc 

harmful  substance and without UV and infrared. Safety and PRO-environment, suitd for mine etc dangerous location.

Usage:

Replace the way of traditional tubular fluorescent lamp. First dismantle the original starter and ballast 

the bracket. Operating method specification as following .2.tubular      fluorescent lamp; 3.fluorescent lamp bracket

1.starter

Figure 3, step2, open the cover of the bracket, change the method of connecting wires(right)

Figure 4, After setting up the bracket cover, install LED tube.(operation complete)

Standard package

1.Pack with EPE and paper box, as the picture below: Five tubes one EPE Layer, two Layers one box, 10 tubes altogether.

2.Don’t look directly at the powerful light source for a long time.

3.Operation like installing and repairing should be done by professional staff. Prevent electric shock.

4.The height of the stack shouldn’t beyond 2m.

5.To prevent drench and strong mechanical vibration during the transportational process.

 

 

Ads by Google



About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 B2BAGE Limited and/or its subsidiaries and licensors. All rights reserved.