Thermal Insulation Decoration Integration System
1. Low-carbon
2. Low-steel meterials cost
3. Low-labor cost
4. Low-time cos
Low-carbon,Low-steel meterials cost,Low-labor cost,Low-time cost.
Traditional curtain wall construction need to pre-cast the steel plate in pouring of concrete,or after it postopsition chemical bolt.Then constructe steel joist with metal pendants,put into thermal insulation meterials,decorative stone meterials be fixed at the end.
HEIFS Composite Panel , just needs fix hardware based on architecture drawing,put thermal insulation adhesive mortar and fix HEIFS Composite Panel .
We leave out the steps ,Pre-cast the steel plate , steel joist , Putting into thermal insulation .
We need thickness of stone 10--15mm , not 25--30mm , saving cost of stone.
HEIFS Composite Panel save the time of construction period , the cost of labor , the cost of steel , the stage of construction , save cost from every details . The most important is improve the construction quality , aesthetics , and low-carbon conception .