1.diameter:8mm-25mm
2.annual capacity:1000tons-12000tons
3.annual working hours:11 months
4.furnace:combined induction
Annual productivity:5000 tons
Stove structure:combined stove of 3 parts(2 melting stoves and 1 insulting stove)
Number of casting rods:8
Diameter of castig rod:20mm,25mm
Upward gong speeding :0~1000mm/min
Annual working hours:7200hrs
Liquid level tracing precision: ±2mm
Specification of coils: φ700mm×φ1500mm
Coiling mode :automatic adjustment of the curve rate
Copper melting speed:650kg/h
Power consumption of copper melting :320kwh/ton
Material feeding mode:electric hositing block or electric arm for the feeding of whole lumps of electrolytic copper
Driving mode of upward movement:AC servo motor;transmission chain is a zero clearance synchronized tooth belt
Fixture mode of the upward going copper rod:cylinder fixture
Operation interface:servo motor controlled by independent touch screen;computerized data recording,alarming and displaying systems are available.