MOQ: 1 set
Delievery: within 100 days
Payment mode: T/T
1. Company information
Our company was founded in 2004. Our two designers have been engaged in this field for over 20 years. We have 33 full time employees here and 1 in part time. Otherwise, we hire people when we are in short of labor. We have strict quality supervision.
2 Our partners
We have cooperated with many companies, such as at home the Tianjin zhongliang Co.,Ltd. (Chinese state enterpreses), Shandong Huijin Group, Hangzhou Jin ma Packing Co.,Ltd. We have also exported products to Nigeria and Vietnam on September this year.
3 After-sale services
We will send our technicians to your place to install the equipment. We assure the products quality for one or two years according the products different. We will resolve any problem happened by sending our techinicans immediately to check if you have this kind of need.
4 Technical parameter
Place of Origin | Zhejiang, China (Mainland) |
Brand Name | qiaoxing |
Model Number | many kinds |
(L*W*H) | 42m*2.5*2.6 |
Temperature | 260-390 |
line speed | 0-100m/min |
Variety of coating material | Solvent-borne coatings |
heating | Gas, electricity, oil |
product specificcation | 0.2mm-1.0mm(thick) 900mm-1500mm(W) |
coating thickness | 10-30um |
5 Detailed equipments
The line consists of mechanical equipment, coating equipment, drying equipment, pre-processing equipment, auxiliary system and electric control device, etc.
Mechanical equipment mainly includes:
1.Loading cart (2)
2.Decoiler (2)
3.Decoiling frame
4.Seaming plate device 1set
5. inlet hydraulic shear 1set
6. Looping tower (2)
7.pintch roller 3 set
8 chemical . Pre-processing equipment 2 set
9. Cleaning system 2 set
10. Passivator coating tank 1 set
11.dry oven of pre-treatment 1 set
12. Coating equipment 5 set
13.curing oven 2 set
14. Inlet tension roller 1 set
15. Pendant tension roller 1 set
16. Speed tension roller 1 set
17. outlet tension roller 1 set
18. outlet hydraulic shear 1set
19. Coiler 1 set
20. Unloading cart 1 set
21. Deflecting roller(including tension roller ) 70 pieces
22. Alignment control system CPC 6 set
23. Operating platform 1 set
24.Auxiliary system mainly includes:
Auxiliary hydraulic system
Alignment control system
Cleaning system
Circulating cooling water system (to be provided by the factory)
Tail gas treatment system (pipe to be provided by the factory)
Electric control system:
AC driving system
Line operation, interlock and protection system
Coiling EPC control
Furnace temperature auto/manual control
Tail gas system control