Welcome to B2BAGE
mobile twin drum asphalt mixing plant
mobile twin drum asphalt mixing plant

Minimum Order: 0
Quality/Safety Certification: 0.00


mobile asphalt mixing plant
1)Capacity:15t/h
2)Power:Oil/34kw,Coal/56kw
3)Fuel consumption:Coal13-15kg/t;Oil5-7.5kg/t

mobile asphalt mixing plant-15t/h

 

 

1.Integrated design of drying and batching drum,reduce initiate cost for customer.

 

2.Simple structure,easy operation,drying while drum rotate in counter -clockwise

  direction(from burner),discharging while drum rotates in clockwise direction(from burner),and

  the wind are swirled in the center of the drum.

 

3.PLC control,touch screen,auto/manual switchable.

 

4.Towing chassis for easy transport and installation.

 

5.Burner is available for coal and oil,at customer's option.

 

TypeGCS-8GCS-10GCS-15GCS-20GCS-30
Capacity8t/h10t/h15t/h20t/h30t/h
powerOil22kw25kw34kw48kw60kw
Coal41kw43kw56kw70kw92kw
product temperature120-180°C adjustable
Fuel consumptionOil:5-7.5kg/t      Coal:13-15kg/t
Mixer capacityAggregate batcher,storage silo,coal miller,wet filter,bag house filter,control room bitumen heating tank

 

 

 

Mobile Asphalt Mixing Plant Auto Production Line

 

1)Integrated design of drying and batching drum,reduce initate cost for customer.

 

2)Aggregate feeding.

 

3)Aggregate discharged into drying drum.

 

4)Mineral aggergates are continuously lifted in the drying drum,forming"material curtain",and

   conducting intensive heat exchange with the flame of the burner,and aggregate is conveyed into

   the its elevator.

 

5)Hot aggregate discharged to mixer drum,QCS Series adopts filer elevator making filler get into

   mixer drum,then the more aggregate is lifted and discharged into drying drum.

 

6)Mineral aggregates,filler and biumen are continuously lifted and uniformly mixed in the mixer         

   drum,the drying drum and aggregate's elevator continuously cycle work.

 

7)Asphalt Discharge:Mixer drum ends mixing after hot minteral aggregates being uniformly bound

   finished product material is discharged out.

 

8)If there is the storage silo,finished product material is lifted by its elevator to its storage silo and

   discharged into the storage silo and then stored.

 

 

You are welcomed to visit us!

We will arrange a pick up from Jinjiang airport which is 5 minute's drive.

It will be our honor to book a hotel according to your personal taste!

Contact us anytime if you need!

 

 

If interested,

Please Contact us at

Attn: Ms Vicky

Tel:86-595-85671788

Mob: 86-13960255552

Email: chenyaqiao(at)163.com

 

Ads by Google



About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 B2BAGE Limited and/or its subsidiaries and licensors. All rights reserved.