MIlk packing machine

   

Milk packing machine

 

Main Instruction :

1. install the machine in dry and ventilated place with sufficient lighting ,the four undercarriages of the machine body should be firm. Fix the machine with four embedded bolts.

2. Fill the object container with clean water(or 75 degree alcohol )cover the rubber pipe covering on the outlet pipe (keep awayfrom the transverse copper block)before lead the water to the drain (or for recycle usage )Start the machine and run for 5-10 minutes to rinse the pipe so as to meet the foodstuff sanitary standard

3. Mount plastic coiling tape core onto take-up spool. Adjust till it is on the centerline of former. So that the coiling tape can be in same width at both right and left sides. Then separately screw

down the screws on both fixing sleeves . Adjust damping swing link at proper spring pressure until it swings freely after the bag is dragged automatically and the brake is in good order

4. put feed tape through two guide pipes and buckle it to the former. Keep feed tape symmetrical in both right and left sides .Adjust the date to the right day. The date is in the order of year, month

and day from top to bottom

5. Adjust thermal vertical sealing temperature to the range between 120 degree and 150 degree and thermal transverse sealing temperature between 200 degree and 250degree(ltis not allowed to exceed 260 degree ,otherwise hot sealing die head will be damaged) .The adjustment of temperature subjects to the quality and thickness of bag at that time. And then carefully adjust by fine tuning .Do not start production of filling until preheat for 20minutes, thereafter the machine can go on work and it is not necessary to preheat except for power off.

6. Adjust the position of bag-feeding connection rod on variable crank so as to obtain the desired length of bag. Shorten the length by turning inward and lengthen by turning outward. Cut

off main power supply before adjust. Turn the setting knob after unscrew clam nut of sliding block .Upon he accomplishment of adjustment, tighten clamp nut before restart.

7. Adjust the position of quantitative pump lever on variable crane to obtain the desired filling quantity .Reduce the quantity by turning inward and increase by turning outward . the method is

same to NO.6 The piston ring of maching is an adjustable component. In case of finding leakage on piston rod after using for a period unscrew fixing screw and turn loop bar of piston rod clockwise to make the piston ring expanded so that the leakage can be removed .Rmember that

the adjusting volume should be tiny. Otherwise , the piston ring will be damaged. Tighten clamp nut upon the accomplishment of adjustment to avoid loosening and changing position.

8. During regular production , no other work is needed but press the switch button. The output amount is counted automatically through counter.stop machine upon running out of coiling tape.

Replace nw coiling tape quickly and turn three-way valve of quantitative pump to recycle state to stop feeding liquid . do not feed liquid for continuous production until new bag is formed.

9. Filter in advance if there are many solid matters in filling liquid. After the machine is used for a period , in the case of finding vertical and transverse sealing non-dahesive cloth worn,unscrew cloth clamp pipe and adjust the colth position with a section of distance and then tighten the cloth clamp pipe(adjust before worn completely)

10. the highest position of liquid level in the filling tank (barrel )should not exceed 0.5meter above quantitative pumpe so as to ensure the precision of quantity. If there is control vave in the pipe for transfusion , the control valve is not allowed to bein off state.

11. Regularly check vertical and transverse sealing copper, blocks. Clean away the dirt stuck on the surface of copper blocks with metal tool or scrape with sand paper . Otherwise the working

surface will be damaged and can not be used again. After the cooling of copper blocks , wipe the surface with cloth or wooden tool dipped with organic solvent to remove the foreign matters.

12. Regularly apply methy isilicone oil 210-350cs to vertical and transverse sealing non-adhesive cloth to lengthen service life of non-adhesive cloth and obtain optimal hot sealing result.

13. in case of finding abnormal phenomena such as poor sealing ,bag connected with each other, leakage,ect pricking with hand or tools is strictly prohibited .Stop the machine immediately for troubleshooting.

14. Action routines and coupling size are set to optimal sate before delivery .For maintenance ,skilled technician is required record the original coupling sizes before dismantle.

Ads by Google



About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 B2BAGE Limited and/or its subsidiaries and licensors. All rights reserved.