Welcome to B2BAGE
Composite waterproof roof coating HX-K11
Composite waterproof roof coating HX-K11

Minimum Order: 0
Quality/Safety Certification: 0.00


1.environmental friendly
2.high quality cement composed
3.especially for rainy areas
4.suitablel for kitchen,bathroom,roof

 Product characteristics

1.Green product, non-toxic, non-pollution, harmlessness,can be used in waterproof of drinking-water pool.

2.Can be constructed on the wet  base surface,especially adapting to the waterproof of rainy areas.

3.Excellent Cohesiveness with many kinds of materials’ dry or wet surface. It can paste ceramic tile right after completion.

 

Application scope

–It can be widely use in Leak-proof, anti-seepage of building roof, underground projects, interior and exterior wall, kitchen, lavatory and pool.

 

packaging and storage

1.Plastic barrels and woven bag with liner inside sealed packaging. 10kg/group, 20kg/group, 34kg/group

2.Be storage in cool dry place, against sunshine and frozen.

3.Since the day of production the expiry time is 12 months. It can still be used if it beyond the expiry time while it’s tested qualified.

 

Performance indexes (executive standard: JC/T 984—2005)

NO.

experimental projects

technical indicators

1

Appearance

after mixing liquid material no precipitation,

power not agglomerated and homogeneous

2

Setting time (h)

Initial setting time(min)

≥45

Final setting time(h)

≤24

3

Penetration  pressure(MPa)

7d

≥1.0

28d

≥1.5

4

Adhesion Strength (MPa)

7d

≥1.0

28d

≥1.2

5

compressive strength(Mpa)

28d

≥24.0

6

Flexural Strength(Mpa)

28d

≥8.0

7

Proportional of press and break

≤3.0

 

Notices

1. Construction temperature should be above 5 oC. Open-air project avoid rainy days or avoid constructing on base surface with water.

2. Do not do second coating until the first coating is dry.  The construction of protective layer or decorative layer should be done only after the first coating is dry.

 

Trade item

Port   Guangzhou/Shenzhen

MOQ  1Ton/Tons

Lead time   3-5days

Payment  30% advance, 70% balance should be paiy once production finished.

 

 

Ads by Google



About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 B2BAGE Limited and/or its subsidiaries and licensors. All rights reserved.