Welcome to B2BAGE
HX-3001 Bathroom and kitchen use water-proof adhesive glue
HX-3001 Bathroom and kitchen use water-proof adhesive glue

Minimum Order: 0
Quality/Safety Certification: 0.00


1.waterborne paint
2.bi-component
3.easy operation, convenient and safety
4.coating hard, water-resistant, ageing-resistant

 Product interduction

HX-3001 Kitchen and Bath Room Dedicated Waterproof Glue is a health and green product which designs according to some building part which has higher requirement to environment protection, such as kitchen and bathroom. This kind of material is top grade, health and environment protection, non-toxic, tasteless, non-pollution, excellent waterproof material.

 

 Product characteristics

1.Water paint, healthy environmental protection product.

2.Cold construction, easy for operation, convenient and safety.

3.Coating hard, water-resistant, ageing-resistant and has a good cohesiveness with construction surface.

 

 Application scope

1.Specially for kitchen, bathroom and watertank waterproof.

2.The waterproof and anti-seepage for building parts such as crack, wall tubes and water drain places

3.Also can be used for Adhesive of surface material.

 

Packaging and storage

— Plastic barrels and woven bag with liner inside sealed packaging; 20kg/pail.

— Be storage in cool dry place, liquid material against sunshine and frozen, while powder material  prevent affected with damp.

— Since the day of production the expiry time is 12 months. It can still be used if it beyond the expiry time while it’s tested qualified.

 

Performance indexes

No.

experimental projects

technical indicators

1

Solids content (%)

≥70

2

Setting time (h)

Initial setting time(min)

≤4

Final setting time(h)

≤8

3

Tensile strength(MPa)

≥1.8

4

Elongation (%)

≥80

5

Low temperature and flexible(10mm stick)

--------------

6

Cohesive Strength(Mpa)

≥0.7

7

Imperviousness (0.3MPa, 0.5h)

impervious

 

Notices

1. Construction temperature should be above 5°C. Open-air project avoid rainy days or avoid construct on base surface with water.

2. Do not do second coating until the first coating is dry.  The construction of protective layer or decorative layer should be only after the first coating is dry.

 

Trade item

Port   Guangzhou/Shenzhen

MOQ  1Ton/Tons

Lead time   3-5days

Payment  30% advance, 70% balance should be paid once production finished.

 

.

  

Ads by Google



About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 B2BAGE Limited and/or its subsidiaries and licensors. All rights reserved.