Welcome to B2BAGE
Heat-resistance colorful roof paint coating HX-EVP
Heat-resistance colorful roof paint coating HX-EVP

Minimum Order: 0
Quality/Safety Certification: 0.00


1.colorful waterproof coating
2.non-toxic, non-pollution
3.good abrasive resistance
4.heat-resistant and uvioresistant

Product introduction

HX-EVP  developed special for beautify of city building, made from building emulsion and addition with various additive. It can form tough, none joint, excellent aging resistance and stereo network structure waterproof film After painting.

 

Product characteristics

1. non-toxic, non-pollution, tasteless, easy and safety construction.

2. high Adhesion force of coating. 

3.Do not limit to the traditional black and gray roof, it is colorful and can paint out different patterns according to requirement.

3. excellent weather-resistance and aging-resistance

4. excellent abrasive resistance and Puncture-resistant

 

Application scope

Can be widely use in waterproof, anti-seepage and beautify project of old or new building roof and interior or exterior wall.

 

Package and storage

1.Plastic Barrels Sealed Packaging, 25kg/pail.

2.Be storage in cool dry place, against sunshine and frozen.

3.Since the day of production the expiry time is 12 months. It can still be used if it beyond the expiry time while it’s tested qualified.

 

Performance indexes (executive standard: JC/T 864—2008)

No.

experimental projects

technical indicators

1

Drying time (h)

Surface drying time

≤4

Actual drying time

≤8

2

Solids content (%)

≥65

3

Tensile strength(MPa)

≥1.5

4

Elongation (%)

≥300

5

Low temperature and flexible(10mm stick)

-20°C, no rack

6

Imperviousness (0.3MPa, 0.5h)

impervious

 

Notices

1. Construction temperature should be above 5 oC. Open-air project avoid rainy days or avoid construct on base surface with water.

2. Do not do second coating until the first coating is dry.  The construction of protective layer or decorative layer should be only after the first coating is dry.

 

Trade item

Port   Guangzhou/Shenzhen

MOQ  1Ton/Tons

Lead time   3-5days

Payment  30% advance, 70% balance should be paid once production finished.

 

 

 

Color sample

 

 

 

 

  

Ads by Google



About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 B2BAGE Limited and/or its subsidiaries and licensors. All rights reserved.