Welcome to B2BAGE
Waterproof liquid wall coating
Waterproof liquid wall coating

Minimum Order: 0
Quality/Safety Certification: 0.00


Waterproof liquid wall coating
1.No VOC,green
2.High elasticity
3.cement based coating
4.interior wall coating

Waterproof liquid wall coating 

Products features

1.Super permeability, internal concrete permeable crystallization makes it resistant to breakage.

2.Super "Self-healing" which mend microcracks on its own. It has long-term impermeability, and high resistance to high Hydraulic pressure. It falls into category of Inorganic material,out of the question of ageing. Service life is as long as the concrete.

3. Resistant to frost heaving and thawing circulation, inhibiting alkali-aggregate reaction, preventing Chemical corrosion from damaging the concrete structures, protecting steel bars without damage to concrete caused by expansion.

4.Non-toxic, environment-friendly, excellent properties of temperature resistance, Humidity tolerance, oxidative resistance, carbonization resistance, ultraviolet resistance, radiation resistance. 

5.Construction is convenient and rapid, shortening construction period.  After construction, no need to install protective layer, lowering comprehensive cost at large.

 

Main Application
The Waterproof materials liquid is widely used on waterproof and protective works of industrial and civil constructions like underground projects, metro, tunnels, pools and concrete structures of water conservancy projects. 

 

Technique Data 

 

 

Points for attention

1. During construction, gloves, masks and safety goggles against dust are strongly recommended to be worn by workmen.

2.Keep ventilation at construction site, clean up hands after construction.

3.Construction is not a allowed  if the temperature is lower than  5°C.

4. It should be sealed and stored in the shade, ventilation, dry place. 

 

Storage &Transportation

 Keep it in a dry place.  Under standard condition, quality guarantee period is one year. After testing, if it is qualified, it can put into use further even it is stored more than 1 year.

 

Construction Requirement

1.Make sure that the base surface is leveled, firm, clean, oil-stain-free, dust-free and without other contaminants. Dry base surface needs wetting in advance and drying up by airing or under the sun until it has not ponding water.

2. Put power materials into a container with clean water while Stirring the mixture until it becomes uniform paste with agitators.
3.Water-adding Proportion

   1)Shelling-out :27% or so(6.5—7L water/25kg powder materials)

   2)22% or so(5.3—5.8Lwater/25kg powder materials)

4.Coat two layers of paints on treated base materials by fur brushes, squeegees or rollers without any place uncoated. The thickness of the two layers should be 1.0-1.2mm or so. Generally, the second layer should be coated 3-4 hours after coating the first layer.
5.The directions of coating two layers of paints should be perpendicular.

6.Further construction can not be carried before the coating is dry.  



Certification

ISO9001:2000, ISO9001:2008, ISO14001:2004

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ads by Google



About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 B2BAGE Limited and/or its subsidiaries and licensors. All rights reserved.