Welcome to B2BAGE
suspended scaffolding
suspended scaffolding

Minimum Order: 0
Quality/Safety Certification: 0.00


Suspended scaffolding CE:
1) Rated Load: 500 630 800KG
2) Lifting Speed: 9.3 9.3 8.2m/min
3) Length of platform: 1--7.5m

Zhenda series temporary suspended Platform (ZLP) is a kind of suspended scaffolding which is temporarily installed on a building or structure for specific tasks such as painting and insulating work, cladding, repairs and refurbishment building, bridges, chimneys, silos and other structures, etc. Temporary suspended Platforms consist of a suspended platform loading persons and objects, hoist driving through wire rope to move up and down, safety lock locking for protection, and suspension rig which are assembled prior to use on a work site.They are dismantled and removed from site on completion of the work for which they were installed. These are featured by large load capacity, stable operation, high lifting speed, long endurance, high efficiency, and multifunction.

 

 

Rated Load: 500KG630KG800KG
Lifting Speed:  9.3m/min9.3m/min 8.2m/min  
Platform Dimension(2500×2)×690×1180(2000×3)×690×1180(2500×3)×690×1180
Power of hoisting machine 1.5kw×2pcs1.5kw×2pcs1.8kw×2pcs
Hoist modelLTD6.3LTD6.3LTD8.0


 

 

Related Products
Ads by Google



About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 B2BAGE Limited and/or its subsidiaries and licensors. All rights reserved.