test transformer
1.A update insulating medium-SF6
2.make high-voltage test
3.operate on-site
tes transformer
Description of GYD testing transforme
GYD testing transformer and Control platform for GYD testing transformer
Parameter of GYD test equipment
Model | Capacity (KVA) | Input voltage(V) | Output voltage(KV) | Output current(MA) | Output DC voltage (KV) | Weight (kg) |
GYD-1.5/50 | 1.5 |
200 |
50 | 30 |
70 | 20 |
GYD-3/50 | 3 | 60 | 30 | |||
GYD-5/50 | 5 | 100 | 35 | |||
GYD-10/50 | 10 | 200 | 40 | |||
GYD-15/50 | 15 | 300 | 50 | |||
GYD-20/50 | 20 | 400 | 55 | |||
GYD-25/50 | 25 | 500 | 60 | |||
GYD-30/50 | 30 | 600 | 65 | |||
GYD-5/100 | 5 |
400 |
100 | 50 |
140 | 60 |
GYD-10/100 | 10 | 100 | 65 | |||
GYD-15/100 | 15 | 150 | 70 | |||
GYD-20/100 | 20 | 200 | 75 | |||
GYD-25/100 | 25 | 250 | 80 | |||
GYD-15/150 | 15 |
150 | 100 |
| 85 | |
GYD-20/150 | 20 | 130 | 90 | |||
GYD-25/150 | 25 | 160 | 95 | |||
GYD-30/150 | 30 | 200 | 100 |
Parameter of control platform for GYD test equipment
Model | Capacity (KVA) | Power supply | Output | Weight (Kg) | |||
phase | Voltage (V) | Frequency (Hz) | Voltage (V) | Current (A) | |||
XC-3 | 3 | 1 | 220 | 50 | 240 | 13.6 | 17 |
XC-5 | 5 | 1 | 220 | 50 | 240 | 22.7 | 20 |
TC-10 | 10 | 1 | 220 | 50 | 240 | 45.5 | 40 |
TC-15 | 15 | 1 | 220 380 | 50 | 240 430 | 68 39 | 50 |
TC-20 | 20 | 2 | 380 | 50 | 430 | 52.6 | 55 |
TC-30 | 30 | 2 | 380 | 50 | 430 | 78.9 | 79 |
TC-50 | 50 | 2 | 380 | 50 | 430 | 131.5 |
|
Feature of product
1.Applying to varies kinds of power equipments detection and prevention of testing laboratory.
2.with advanced insulative material and high-quality magnetic alloy material.
3.Small-volume, light in weight.
4.Attractive appearance.
5.Stable property.
6.Operating simply and expediently on-site.
7.it's portable.
8.it's update and new type DC-AC testing transformer.
9.With high insulating strength and High moisture resistant
10.with advanced insulative material and moisture resistant insulating material.
11.it can be used widely for the insulators’ voltage-resistance testing and partial-discharge testing in electrical power system,industrial,mining enterprises,etc.