... using life time scaffolding -- safe and convenient for transportation --high bearing capacity. Cup-lock system is made up of top cup, bottom cup and ledger blade ... .Its easy assemble and friendly using with simple structure.Its mainly used in bridges construction support. Scaffolding ...
Cross-Lock scaffolding is the preferred system for construction support, Bridges and Buildings construction. Cross-Lock scaffolding is the preferred system for construction support, Bridges and Buildings construction. Scaffolding 1 ...
smart electronic mortise door lock for access system 1.working voltage:12VDC 2.start current:0.85A 3. ... working current:0.27A smart electronic mortise door lock for access system Parametersworking voltage:12VDCstart current:0.85Aworking current:0.27AMagnet ... control system; suit for wood door,metal door, glass door and fire door2,with LED,voltage range:9-15VDC,noiselessness electric lock ...
Video support system Audio/Video holder With 6mm tempered glass and cable management can be used with or without flat Video support systemModel No.:V-06M02 FeaturesAudio/Video holderCold rolled steel With 6mm tempered glassWith cable managementMax-load:12kgsCan be used with or without flat panel SpecificationsMax Weight: 12kgs
... doorbell Doorbell 1/4" color CCD camera 4 wires connection lock control video intercom, doorbell Doorbell,video doorbell1/4" color color ... CCD cameraSurface constructionSupport 4 wires connectionSupport lock controlOperating temperature is from - 35 °C to + 60°Coutput power ...
... Octopus Metal is a leading manufacturer of galvanized cable management system. Cable ladder is a prefabricated metal structure consisting of two ...
... EN74 standard Cuplock System's unique node point connection allows up to ... device is formed by two cups, a fixed lower cup whcih is welded to the vertical component at pre- ... located interbals and a sliding upper cup. The forged blade ends of the horizontal components are ... located into the lower cup, the upper cup is moved down and ratated to secure the ...
Save time/Save Money/Save labour Friendly Enviroment/Save energy Easy to install and load one could make up 50M2/hour Competitive prices/when building roof do not need wood / steel pipe to support,Our products could be used 300time,6 times of the timber oneUsed easliy but the loading strength is 1 ton/M2High effeciency 1 worker could make up 50 square meters
Bottom cup, cup lock scaffolding parts. We provide: 1: Good quality product 2. Lower price 3. Best service, techinical support. bottom cup,top cup, drop top cup, cup lock scaffolding, scaffolding parts------------------------------------------------------------------------------------Product ...
1.Car central door lock, central locking system 2.Four door single controll 3.1 master 3 slave. ... , 1 master 3 slave.2.Universal car central locking system;when unlock-lock the door of driver seat,controlling other three doors ...
1. for octanorm system 2. zinc surface treatment 3. 3 year warranty, 200kgs ... for exhibition booth/ with photos and construction manualKJ tension lock series:Straight tension lockHigh position tension lockCurve tension lock45 degree ... tension lockTension lock for syma systemTension lock for 6.4mm slotTension lock for 9mm slot
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 B2BAGE Limited and/or its subsidiaries and licensors. All rights reserved.