RV-LUGP wholesale vortex-street corrosion resistance big pipe gas flowmeter for gas(Plug-in type)
RV-LUGP wholesale vortex-street corrosion resistance big pipe gas flowmeter for gas(Plug-in type)

Minimum Order: 0
Quality/Safety Certification: 0.00


RV-LUGP Plug-in type analyzer indicator
1. SBL data display
2. 4-20mA,0-10V,impulse,RS485 outputs
3. delivery:one week

 RV-LUGP vortex-street flowmeter for steam(Plug-in type)

1) Category and applications 

 

 

Applications

 

Gas: air,carbon dioxide,oxygen gas,nitrogen,

coal gas,natural gas,methane and other chemical gas.

Liquid: water,high-temperature water,oil,

food liquid,chemical liquid.

Steam: saturated vapor,superheated steam.   

Medium temperature Plug-in&low-temperature:-40~250 centigrade

Nominal pressure

 

Plug-in:≤1.6Mpa,≤2.5Mpa

Nominal diameter

      

 ---flange&plug-in:DN300~DN1500mm

 

Instrument materials

 

Stainless steel 304L;other material can deal

Range of flow speedLiquid(water):0.25M/S~9.5M/S  Gas:4M/S~78M/S Vapor:3M/S~78M/S   

Relative humidity

 

 5%~90%
Reynolds number

 

Re>4000
Drag coefficient

 

  Plug-in type: Drag loss can be omitted
Degree of anti-explosionIntrinsic safety type: ia  T2~T5, Explosion-proof type: d  BT4
Intrinsic error

 

Plug-in type:  ±2.5%
DC supply

 

+3.6V, +12V, +24V (Field data show the supply is +3.6V for 3 to 5 years)
Output signal

 

 

Frequency impulse signal: 1~2600Hz, low level≤1V, high level≥5V, transmitter: two-wire system 4~20mA
flange Material

 

stainless steel , Explosion-proof  or  PVC

 

 The plug into type Wo street flow meter installation steps:

1.   Open the circular aperture of the φ 100 mms of a≥ with the oxyacetylene welding on the piping, and clear the circular aperture surround hair sting clean, measure a revolution with assurance fluent

2.   At piping circular aperture the law orchid for providing in the plant house of soldering, request the law orchid the shaft wire and the piping shaft wire vertical.

3.   The screw that the even Ning tightly presses to cover.(Note:The fluid flies to mark the last indication reconciliation with direction)

 

 

4.   Check whether each link completion good, slowly open whether observation in the valve portal has leakage(need special note Human body safety) if already reveal to please repeat step 4, 5. 

 

 

(mm)

DN250

DN300

DN400

DN500

DN600

DN800-

2000

L

255

280

330

380

430

530

Ads by Google



About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 B2BAGE Limited and/or its subsidiaries and licensors. All rights reserved.