Welcome to B2BAGE
Environmental friendly basement waterproof coating HX-JS
Environmental friendly basement waterproof coating HX-JS

Minimum Order: 0
Quality/Safety Certification: 0.00


1.non-toxic, non-pollution
2.short construction duration
3.excellent Cohesiveness
4.weather resistance
5.coating tough

Product introduction

HX-JS is a bi-component waterproof coating which formulated with organic liquid material (Pure acrylic emulsion, styrene-acrylic emulsion, etc), inorganic powder (high grade cement, quartz sand, etc) and various functional assistant agent.After painting it can form a film of high intensity, excellent Cohesiveness and excellent weather resistance. 

 

Product characteristics

1.water paint, non-toxic, non-pollution. It is a environment-friendly product.

2.cold construction, low moisture content demand of construction basic unit, short construction duration.

3.have excellent Cohesiveness with many kinds of materials’ dry or wet surface. It can use to paste ceramic tile right after finishing construction.

4.Coating of tough, weather resistance, water resistance, durability.

 

Application scope

1.Can be widely use in Leak-proof and anti-seepage of building roof, basement, exterior wall, lavatory and building parts such as crack, wall tubes, water drain places.

2.Type I mainly used in the not Permanently soggy building waterproof project, Type II mainly used in the permanently soggy building waterproof project.

 

Performance indexes(executive standard: GB/T 23445—2009)

NO.

experimental projects

technical indicators

I

II

III

1

solids content(%) 

≥70

2

Drying time (h)

Surface drying time

≤4

Actual drying time

≤8

3

Tensile strength(MPa)

≥1.2

≥1.8

≥1.8

4

Elongation (%)

≥200

≥80

≥30

5

Low temperature and flexible(10mm stick)

-10°C no crack

……

……

6

               Bonding strength(Mpa)

≥0.5

≥0.7

≥1.0

7

Imperviousness (0.3MPa, 0.5h)

impervious

 

Notices

1. Construction temperature should be above 5 oC. Open-air project avoid rainy days or avoid construct on base surface with water.

2. Do not do second coating until the first coating is dry.  The construction of protective layer or decorative layer should be only after the first coating is dry.

 

Trade item

Port   Guangzhou/Shenzhen

MOQ  1Ton/Tons

Lead time   3-5days

Payment  30% advance, 70% balance should be paid once production finished.

 

 

 

 

 

Ads by Google



About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 B2BAGE Limited and/or its subsidiaries and licensors. All rights reserved.