1.non-toxic, non-pollution
2.short construction duration
3.excellent Cohesiveness
4.weather resistance
5.coating tough
Product introduction
HX-JS is a bi-component waterproof coating which formulated with organic liquid material (Pure acrylic emulsion, styrene-acrylic emulsion, etc), inorganic powder (high grade cement, quartz sand, etc) and various functional assistant agent.After painting it can form a film of high intensity, excellent Cohesiveness and excellent weather resistance.
Product characteristics
1.water paint, non-toxic, non-pollution. It is a environment-friendly product.
2.cold construction, low moisture content demand of construction basic unit, short construction duration.
3.have excellent Cohesiveness with many kinds of materials’ dry or wet surface. It can use to paste ceramic tile right after finishing construction.
4.Coating of tough, weather resistance, water resistance, durability.
Application scope
1.Can be widely use in Leak-proof and anti-seepage of building roof, basement, exterior wall, lavatory and building parts such as crack, wall tubes, water drain places.
2.Type I mainly used in the not Permanently soggy building waterproof project, Type II mainly used in the permanently soggy building waterproof project.
Performance indexes(executive standard: GB/T 23445—2009)
NO. | experimental projects | technical indicators | |||||
I | II | III | |||||
1 | solids content(%) | ≥70 | |||||
2 | Drying time (h) | Surface drying time | ≤4 | ||||
Actual drying time | ≤8 | ||||||
3 | Tensile strength(MPa) | ≥1.2 | ≥1.8 | ≥1.8 | |||
4 | Elongation (%) | ≥200 | ≥80 | ≥30 | |||
5 | Low temperature and flexible(10mm stick) | -10°C no crack | …… | …… | |||
6 | Bonding strength(Mpa) | ≥0.5 | ≥0.7 | ≥1.0 | |||
7 | Imperviousness (0.3MPa, 0.5h) | impervious |
Notices
1. Construction temperature should be above 5 oC. Open-air project avoid rainy days or avoid construct on base surface with water.
2. Do not do second coating until the first coating is dry. The construction of protective layer or decorative layer should be only after the first coating is dry.
Trade item
Port Guangzhou/Shenzhen
MOQ 1Ton/Tons
Lead time 3-5days
Payment 30% advance, 70% balance should be paid once production finished.